|
|||
The K-535 Yuriy Dolgorukiy, first Project 955 Borey-class SSBN
|
|||
|
|||
Armament
The submarine is armed with the D-30 missile system (16 launchers of Bulava intercontinental ballistic missiles) and 533mm torpedo tubes. Under the initial Project 09550, the Borei subs should have been armed with R-39UTTKh Bark missiles developed by the Makeyev State Rocket Center (Miass, the Chelyabinsk Region). However, the work on this armament system was terminated after a series of failed tests and the submarine’s design was modified for the Bulava missile developed by the Moscow Institute of Thermal Technology. List of submarines No less than eight strategic nuclear-powered submarines of this type will be built. Three such submarines have been delivered to the Navy by now. The K-535 Yuri Dolgoruky (Factory No. 201) was laid down on November 2, 1996 under Project 09550. The construction of the sub’s pressure hull was completed only ten years after that due to the shortage of funds and the need to reequip it for Bulava missiles (Project 09551). The submarine was floated out on February 13, 2008 and delivered to the Russian Navy on January 10, 2013. The K-550 Alexander Nevsky (Factory No. 202, Project 09551) was laid down on March 19, 2004 and floated out on December 6, 2010. The submarine was delivered to the Navy on December 23, 2013. The K-551 Vladimir Monomakh (Factory No. 203, Project 09551) was laid down on March 19, 2006, floated out on January 18, 2013 and delivered to the Navy on December 10, 2014. The subsequent strategic underwater missile cruisers are being built under Project 09552 (Borei-A). They are distinguished by their better stealth capability, more advanced electronic equipment and more comfortable conditions for the crew. Russia’s Defense Ministry signed two contracts on their construction (the first contract for one submarine and the second contract for four underwater missile cruisers) with the United Shipbuilding Corporation on May 25, 2012. Five Borei-class nuclear-powered submarines are at the stage of their construction: The Prince Vladimir (Factory No. 204, Project 09552) was laid down on July 30, 2012. The Prince Oleg (Factory No. 205, Project 09552) was laid down on July 27, 2014. The Generalissimus Suvorov (Factory No. 206, Project 09552) was laid down on December 26, 2014. The Emperor Alexander III (Factory No. 207, Project 09552) was laid down on December 18, 2015. The Prince Pozharsky (Factory No. 208, Project 09552) was laid down on December 23, 2016. Chief of Russia’s General Staff Valery Gerasimov said at a board meeting of the Russian Defense Ministry on November 7, 2017 that work had been launched to develop a Borei-B class nuclear-powered submarine with improved characteristics. © Copyright 2017 TASS. All rights reserved. This material may not be published, broadcast, rewritten or redistributed. |
|||
|
|||
Russian TV report on the launch ceremony
|
|||
Russia Launched the First Project 955A Borei-A SSBN Submarine Knyaz Vladimir
- Posted On