|
|||
a | |||
Naval
Forces News - USA |
|||
U.S. Navy May Have Selected Bell-Boeing V-22 Osprey for COD Carrier
On-Board Delivery Missions |
|||
The
U.S. Navy has probably selected the V-22 Osprey tilt-rotor made by Bell-Boeing
to replace the Northrop Grumman C-2A Greyhound for carrier onboard delivery
(COD) missions. Breaking Defense was the first to mention
a memorandum of understanding (MOU) signed on January 5th by Secretary
of the Navy, Chief of Naval Operations and Marine Corps Commandant stipulating
that the U.S. Navy will buy four V-22s each year from 2018 to 2020. |
|||
A sailor provides landing signal directions for an MV-22B Osprey assigned to Marine Medium Tiltrotor Squadron (VMM) 263 to land aboard the multipurpose amphibious assault ship USS Bataan (LHD 5), Aug. 22, 2011. The aircraft was transferring an AV-8B Harrier engine, the first time this type of lift has been conducted at sea by an MV-22B. The Osprey can carry external loads suspended underneath the aircraft at up to 200 knots. U.S. Navy photo by Mass Communication 3rd Class James Turner |
|||
The
final decision on the selected aircraft is expected to be announced
in February. There are three candidates for the replacement of the C-2A
Greyhound (the current aircraft). In addition to the V-22 the two other
candidates are: - Lockheed Martin's S-3 Viking. The U.S. Navy retired the S-3 in 2009 but Lockheed (the original manufacturer) plan is to take the S-3 Viking out of storage and modify them for COD missions. - Northrop Grumman C-2 Greyhound modernisation. Northrop Grumman proposes to modernize the current C-2As with avionics, engines and wings from the E-2D Hawkeye currently in production. |
Scale model of a U.S. Navy HV-22 Osprey on display during Sea-Air-Space 2014 |
|||
If
selected by the U.S. Navy, the V-22 would be specifically modified for
COD duties and be nammed HV-22. They would be owned by the operated by
the U.S. Navy, probabbly by the fleet logistic support squadrons currently
flying the C-2 Greyhound. Prototype C-2s first flew in 1964 and production followed the next year. The initial Greyhound aircraft were overhauled in 1973. In 1984, more C-2As were ordered under the name Reprocured C-2A or C-2A(R). Similar to E-2C Hawkeyes, the C-2As received a further update consisting in eight-bladded propellers. |
|||
Poster on display at the Boeing booth during Sea-Air-Space 2014 showing F-35's F-135 engine power module carry solution |
|||
One of the key requirement
of the new COD platform is the abbility to transport the F-135 engine
for the F-35C Lightning II / Joint Strike Fighter. The above picture
shows two solutions for loading the "engine power module"
inside the V-22 cargo bay: one with a pallet railer, the other with
extended cargo rails. |
|||
An MV-22 demonstrating its ability to operate from a T-AKE cargo ship. Picture: US Navy |
|||