This website uses cookies to manage authentication, navigation, and other functions. By using our website, you agree that we can place these types of cookies on your device.

Indonesian Navy (TNI AL) first SIGMA 10514 PKR launched at PT Pal Surabaya Shipyard

a
Naval Industry News - Netherlands, Indonesia
 
 
 
Indonesian Navy (TNI AL) first SIGMA 10514 PKR launched at PT Pal Surabaya Shipyard
 
PT PAL has launched the first of two SIGMA 10514 Perusak Kawal Rudal (PKR) guided-missile frigates designated for the Indonesian Navy (TNI AL). PT PAL built these ships in collaboration with Damen Schelde Naval Shipbuilding (DSNS). The ceremony was attended by the Guests of Honour, namely the Indonesian Minister of Defense, Ryamizard Rycudu along with Coordinating Minister of Maritime Affairs, Rizal Ramli; ambassadors from neighboring countries; the Governor of East Java, Soekarwo and Chief of the Navy Admiral Ade Supandi.
     
PT PAL has launched the first of two SIGMA 10514 Perusak Kawal Rudal (PKR) guided-missile frigates designated for the Indonesian Navy (TNI AL). PT PAL built these ships in collaboration with Damen Schelde Naval Shipbuilding (DSNS). The ceremony was attended by the Guests of Honour, namely the Indonesian Minister of Defense, Ryamizard Rycudu along with Coordinating Minister of Maritime Affairs, Rizal Ramli; ambassadors from neighboring countries; the Governor of East Java, Soekarwo and Chief of the Navy Admiral Ade Supandi. Launch of TNI AL's (Indonesian Navy) first SIGMA 10514 PKR (Perusak Kawal Rudal) Frigate
     
Coordinating Minister for Maritime Affairs, Rizal Ramli said: “The Launching of PKR1 is a great momentum for the development of the Indonesian Shipbuilding and Maritime Industry. This has shown that Indonesia has the human resources and skills to develop naval vessels. However, we must still improve our technology and knowledge in order to compete internationally. Certainly, this is what we hope to achieve from our partner DSNS.”

Mr. Firmansyah Arifin, President Director of PT Pal: “The launching of the first PKR went very smoothly. We are confident that the installation of the remaining technical parts of the vessel will be carried out in due time, so that the delivery phase can be achieved on or ahead of schedule.”

The SIGMA 10514 PKR frigate was a project initiated in August 2010 by the Indonesian Ministry of Defence. The Ministry awarded a contract to Damen for the construction of the first SIGMA 10514 PKR in December of that year. The first steel was cut by the former Minister of Defence, Mr. Purnomo Yusgiantoro in January 2014 and the keel was laid in April 2014 at PT PAL shipyard in Surabaya. The PKRs are designed and built to endure various missions.
     
PT PAL has launched the first of two SIGMA 10514 Perusak Kawal Rudal (PKR) guided-missile frigates designated for the Indonesian Navy (TNI AL). PT PAL built these ships in collaboration with Damen Schelde Naval Shipbuilding (DSNS). The ceremony was attended by the Guests of Honour, namely the Indonesian Minister of Defense, Ryamizard Rycudu along with Coordinating Minister of Maritime Affairs, Rizal Ramli; ambassadors... Artist impression of TNI AL's (Indonesian Navy) SIGMA 10514 PKR (Perusak Kawal Rudal) Frigate
     
Purpose
Primarily, the vessel will be operated for Anti-Air Warfare, Anti-Surface Warfare, and Anti-submarine Warfare. However, it is also compatible with Maritime Security, Search and Rescue, Patrol, and Humanitarian Support tasks. TNI-Al will be strongly empowered by this state-of-the-art maritime capacity.

Modular construction

The SIGMA 10514 PKR has a proven design and is uniquely built using a modular approach. SIGMA stands for Ship Integrated Geometrical Modularity Approach. In essence, the PKRs are divided into 6 modules of which 4 were built in PT PAL’s shipyards while the other two modules were built and fully tested at DSNS in the Netherlands. The modular building enables greater flexibility, is more cost effective and allows for building in various locations worldwide. Essentially, it provides a large portion of technological transfer. When the 6 modules were complete, PT PAL had the responsibility of integrating them into one sole vessel.

Main characteristics

Technically, the PKR has a length of 105.11 metres, a beam of 14.2 metres and a displacement of 2,365 tons. The vessel features a fully air-conditioned accommodation for up to 122 persons. The helicopter deck is suitable to host a medium sized helicopter hanger with a weight of max 10 tons. The vessel is also equipped with two rigid hull inflatable boats (RHIBs) for rescue and patrol operations. The frigate has a speed of 28 knots, and can sail up to 5,000nm at 14 knots. The endurance is at least 20 days at sea.

The propulsion system of the PKR vessel utilises a combined diesel or electric (CODOE) which consists of two 10,000kW maximum continuous rating (MCR) diesel engines, two 1,300kW electric motors, two double input gearboxes and two 3.65 metre controllable pitch propellers. The vessel is equipped with a sophisticated platform management system that enables operating, control and monitoring of the ship’s auxiliary systems.The vessel will naturally be equipped with a complete, state-of-the-art sensor and weapon package to counter air, surface and sub-surface threats. For self-defence, the vessel is also equipped with comprehensive electronic warfare systems.

The sensory aspect of the SIGMA is equipped with 3-D surveillance radar with a range of 250 km. Furthermore, there is a target indication radar which also has an electro optical fire control system. The sensor array also comprises a Friend or Foe Identification (IFF) system and a hull mounted sonar.
Link to SIGMA 10514 PKR Frigate technical datasheet