|
|||
Video by CNN Indonesia
|
|||
|
|||
Flexibility through innovation
The 105-metre, 2,365 tonne PKR frigates are designed to undertake a wide range of missions in and around the waters of Indonesia. The two vessels have been/are being been built using a collaborative modular process operating simultaneously at Damen Schelde Naval Shipbuilding (DSNS) in the Netherlands and PT PAL shipyard in Indonesia. Each is made up of six modules, and for the first vessel four of these were built at PT PAL. The other two were built and fully tested at DSNS in the Netherlands before being shipped for final assembly at PT PAL. The success of the programme rested on the two yards working together with the end client operating almost as a single unit. The strong relationship also allowed the massive technology-transfer programme to proceed smoothly, both in Indonesia and in the Netherlands. The first Sigma 10514 delivery follows the completion of three months of crew training. Meanwhile, work is currently proceeding in both the Netherlands and Indonesia on the second vessel in the contract. |
|||
Link to SIGMA 10514 PKR Frigate technical datasheet | |||
|
|||
TNI AL's (Indonesian Navy) first SIGMA 10514 PKR (Perusak Kawal Rudal) KRI Raden Eddy Martadinata. Picture: PT PAL
|
|||