This website uses cookies to manage authentication, navigation, and other functions. By using our website, you agree that we can place these types of cookies on your device.
Second project 06363 submarine "Rostov-on-don" laid down at Admiralty Shipyard
Second project 06363 submarine "Rostov-on-don" laid down at Admiralty Shipyard
Posted On
a
World
Navy Force News - Russia
Second
project 06363 submarine "Rostov-on-don" laid down at Admiralty
Shipyard
This
is the second conventional submarine Project 06363, layed down at the
Admiralty Shipyards in the interests of the Russian Navy. In August
2010 started the construction of the submarine "Novorossiysk"
of the same project/class. Total planned construction of Project 06363
for the Russian Navy is three submarines.
It is assumed that the ships will be serving in the
Black Sea Fleet. Transfer of the Navy of the first submarine series
is to take place in 2013. Completion of the second and the third submarine
is scheduled for 2014. It Previously appeared in the press that the
number of ships in this class can be extended for a further three
units with a term deposit of the last submarine in 2015.
Project 0636.3 Improved Kilo Rostov-on-don keel laying ceremony
Kilo
class, Project 636
(picture: Internet)
"Rostov-on-Don," project 06363 SSK refers
to the third generation of diesel-electric submarines, and is a modification
of projects 877/877EKM known for their high performance characteristics.
Designed in the CDB ME "Rubin". The new 06363 are reported
to be quieter, to be equiped with modern systems of navigation, communication
and modern weapons.
These
submarines have a length of 73.8 m, width of 9,9 m, submerged speed
of 20 knots and maximum immersion depth of 300 m. Their endurance is
45 days and they are served by a crew of 52.