This website uses cookies to manage authentication, navigation, and other functions. By using our website, you agree that we can place these types of cookies on your device.

Boeing Delivers 12th Production P-8A Poseidon Maritime Patrol Aircraft to US Navy

a
Naval Forces News - USA
 
 
 
Boeing Delivers 12th Production P-8A Poseidon Maritime Patrol Aircraft to US Navy
 
Boeing delivered the 12th production P-8A Poseidon on schedule on Oct. 25, enhancing the long-range maritime patrol capabilities of the U.S. Navy. The P-8A departed Boeing Field in Seattle for Naval Air Station Jacksonville, Fla., where it joined the other Poseidon aircraft being used to train Navy crews. The aircraft is the sixth from the second low-rate initial production contract lot awarded in November 2011.
     
Boeing delivered the 12th production P-8A Poseidon on schedule on Oct. 25, enhancing the long-range maritime patrol capabilities of the U.S. Navy. The P-8A departed Boeing Field in Seattle for Naval Air Station Jacksonville, Fla., where it joined the other Poseidon aircraft being used to train Navy crews. The aircraft is the sixth from the second low-rate initial production contract lot awarded in November 2011.
(Picture: Boeing)
     
“This is our second-to-last P-8A delivery of 2013 and the program is meeting all cost and schedule milestones,” said Rick Heerdt, Boeing vice president and P-8 program manager. “As we’ve focused on ramping up production and delivering planes, the Navy is preparing for the first P-8A fleet deployment in the coming months.”

Boeing is on contract to build and support 37 P-8A aircraft as part of four LRIP contracts awarded in 2011, 2012 and 2013. The Navy plans to purchase 117 P-8As, which are based on the Next-Generation Boeing 737-800 platform. The versatile multi-mission aircraft provides anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance capabilities and will replace the Navy P-3 fleet.